The Rehabilitation of National Road No. 11 Posted on ថ្ងៃចន្ទ, 22 ខែកក្កដា, 2019ថ្ងៃចន្ទ, 22 ខែកក្កដា, 2019 អត្ថបទដោយ Than David The Rehabilitation of National Road No.11 with the total length of 6.7Km from Naek Leung to Tnol Tor Teng on 20 July 2019.